ESTec Systems announces ESTec Oilfield's New
Product
ESTec Systems announces details of its latest
product, the IntegraLine 150iH Top developed by Allan R. Nelson
Engineering, a wholly-owned Estec subsidiary.
This new drilling rig component will be produced
by ESTec's latest company, ESTec Oilfield, Inc. at its special construction
site just opened in West Edmonton.
Top Drives increase drilling rig production
and efficiency, transferring much equipment to a stable position
atop the rig. The 150iH is specially designed for fast installation
and easy use atop the popular gasfield double rigs, although it
is adaptable to other types of gas and oil rigs. Priced well below
the industry's best-sellers, and more compact for its features than
almost any other unit, the ESTec Oilfield Top Drive has already
attracted the interest of leading drilling contractors in Canada
and the United States and will be available for sale shortly, after
field testing is completed.
The IntegraLine 150iH is designed to meet the
needs of hundreds of double or similar drilling rigs. Each IntegraLine
Top Drive will sell for approximately C$720,000, a bargain in today's
drilling market, and the basic design is a simple, integrated one
that can be customized at minimum cost to meet every contractor's
need.
Technical History of Top Drives:
As a result of changes in downhole technology in the past 15 years,
and the needs of downhole technology, the industry has developed
a wide range of top drives for larger drilling rigs.
The ESTec Oilfield 150iH IntegraLine Top Drive
is designed for doubles and delivers all the advantages of top drive
drilling previously restricted to larger rigs. The complete top
drive is shorter than the hook block and swivel used in double rigs.
Another trend is the super-single rig with the
capacity of a double, but with a pipe-handling system for drilling
without racking the pipe in the derrick. The Oilfield Top Drive
is adaptable for this application, too. Allan R. Nelson, founder
of Allan R. Nelson Engineering says, "In Canada alone, there
are approximately 200 double rigs operating with the potential to
utilize the ESTec Oilfield IntegraLine Top Drive requirements".
|